PAT® Prescription Athletic Turf® Natural Field Turf Moisture Management Installation Process Case Study Field: Ohio Stadium Location: Ohio State University, Columbus, Ohio Date: Spring 2003 1. Field Preparation Subgrade preparation completed and ready for installation of PAT® System |
|
![]() |
2. Drainage and Irrigation Main drainage and irrigation manifold leading from field to control center |
|
![]() |
3. Sub Base and Drainage Laser graded sub base with main drainage arteries installed |
|
![]() |
4. Installation of Laterals Installation of drainage laterals into main drainage arteries |
|
![]() |
5. Sand Rootzone Sand rootzone being placed over drainage matrix |
|
![]() |
6. Control Panel Control panel for the operation of PAT® automated moisture management systems |
|
![]() |
7. System Manifold Installed Overhead irrigation system manifold and valves installed in control room for easy access |
|
![]() |
8. Installation of Sod Installation of patented TSII® stabilized natural turf in big roll sod |
|
![]() |
9. Ready for Play Installation complete and ready for play |
|
![]() |
|
|