The Motz Group’s TS-II® Synthetically Stabilized Turf® is a patented combination of natural grass growing in a unique mat of fibrillated polypropylene fibers tufted into a dual-component mat of biodegradable jute and plastic mesh infilled with growing medium and turfed with the site-appropriate cool or warm season grass species.

Media Center Link

Joe Motz voted Chairman STC
joepic

Joe Motz has been named Chairman of the Synthetic Turf Council (STC) Board of Directors … [read more]

TSII Synthetically Stabilized Turf®

Australia gets hybrid turf from The Motz Group … [read more]

CASF Craftsmanship Award

The Motz Group was presented with a Special Construction Craftsmanship Award … [read more]

SWB Yankees Go Natural
swbyankees Motz installs HPG® natural turf field for Yankees minor league team … [read more]
Tennessee Tech Hires Motz
eagles

Tennessee Tech University has chosen 24/7™ artificial turf for Overall Field … [read more]

2006 Asian Games
joepic

The Motz Group traveled to Qatar to install a field for the 2006 Asian Games … [read more]

The Motz Group in Miami
joepic

The Motz Group installs a field for the Miami Dolphins … [read more]

Turf install 1  
TSII®
Synthetically Stabilized Turf® Hybrid Turf Combining Natural and Synthetic Grass Case Study


Field: Sheikh Khalifa Stadium
Location: Doha, Qatar
Date: Fall 2006

1. Laser Grade Base
Base material is laser graded at the nursery in preparation for establishing the TSII®.
 

Turf install 2
 
2. Install Stabilizer Matrix
Perforated plastic sheeting is laid down in a continuous process under the TSII® stabilizer carpet.

Turf install 3
 
3. Seams
Head and lateral seams are sewn together to make one continuous surface.

Turf install 4
 
4. Sand Infill For Seeding
Sand is spread in thin lifts and broomed in to stand the TSII® stabilizer fibers upright.

Turf install 5
 
5. Sprigging
After infilling, sprigs are spread by hand over the surface.

Turf install 6
 
6. Harvest
The TSII® is harvested at the nursery in rolls 1.1m wide x 10m long (42” x 30’) for installation in Khalifa Stadium.

Turf install 7
 
7. Grade Stadium Base
Sand rootzone in the stadium is laser graded prior to installing the rolls of TSII®.

Turf install 8
 
8. TSII® Sod Installation
Rolls of TSII® sod are laid down using turf installers.

Turf install 9
 
9. Field Is Ready For Play
Field installation complete and ready for play in less than 40 hours!

turf bar bottom
  24/7 | HPG | PAT | TSII | Home | Contact Us | Sitemap | Privacy Policy
© 2007 The Motz Group 513.533.6452 info@themotzgroup.com
3607 Church Street, Suite 300 · Cincinnati, Ohio 45244
Turf install 1   TSII®
Synthetically Stabilized Turf® Hybrid Turf Combining Natural and Synthetic Grass Case Study


Field: Ohio Stadium
Location: Ohio State University, Columbus, Ohio
Date: Spring 2003

1. Removal of existing turf
Turf is stripped from the field

Turf install 2
 
2. Removal of existing turf
2/3 of field is stripped

Turf install 3
 
3. Laser grading sub-base
Sand topdressing and laser grading of new rootzone surface

Turf install 4
 
4. Stabilizer matrix Installation
Installation of stabilization mat begins

Turf install 5
 
5. Seam details
Carpet is sown together to create a continuous mat across the entire surface

Turf install 6
 
6. Sand infill for seeding
Infilling the carpet with sand rootzone in preparation for seeding

Turf install 7
 
7. Hybrid mix of synthetic and natural turf
3 weeks after seeding 85% cover is achieved
10 weeks after establishment new stabilized turf is fully mature and ready for play

Turf install 8
 
8. Pre-season use of new field
Spring commencement 1st week of June
Metallica concert mid July

Turf install 9
 
9. Game ready
Mature dense turf canopy established over the stabilized carpet

Turf install 10
 
10. Practice
2003 football full squad practices began in August
Season opened with five straight home games

Turf install 10
 
11. Perfectly stable
Turf remained lush, dense and free of divoting all season long

Turf install 10
 
12. Go Buckyees
December - Playing field after full football season, standard renovation strategies (verti-cutting, aeration, overseeding) will prepare the field for another season

osu logo
 
logo3607 Church Street, Suite 300
Newtown, Ohio 45244
513.533.6452
info@themotzgroup.com
www.themotzgroup.com